Addressing Common Pain Points of Hybrid Energy Deployments March 31st, 2020 energy Above: Enatel’s patented dynamic phase balancing technology. The CDC (charge-discharge-charge) principle is simple and well-proven but often fraught with problems, such as: – Lead acid batteries have long absorption phases and generally like to be 100% charged. – Batteries become very expensive as they must be highly cyclic. – The move towards shared tenancy sites creates high load requirement – and very, very large batteries. – Each site requires fine tuning to ensure generators do not stall and optimal generator loading. This white paper discusses how to overcome these issues including: Solar Optimisation Dynamic Generator Anti Stall Phase Balancing Monitoring, Control and Site Visibility Download the white paper today