The Sinuoso site is located in North-West Mexico, on the edge of the Sonora desert and is a fully off-grid site with both 2G (with air-conditioning) and 3G cellular loads in self-contained cabinets.
The site has approximately 7kW of solar already installed and was supposed to be running in a hybrid manner, cycling the batteries. The existing control system never worked and the generator was running 24/7. As a result, the client requested a replacement system that could be proven to operate in a hybrid charge/discharge manner, with the necessary logging to verify its performance.